LG June Price Increase Letter

NEW GUILDSTONE PRICING – EFFECTIVE 5/6/21

ATTENTION: PLEASE READ Beginning 5/6/21, new Guildstone pricing will go into effect. Please see the attached updated price sheet. Unfortunately we will not be able to offer a grace period beyond the 5th due to cost from our suppliers.  This will be effective on all PO’s received after 5/5/21.Please be aware that this pricing will also apply to any custom order that is awaiting approval and PO’s on hold after the date of 5/5/21.We understand this is another quick change, but we appreciate all of your help and support. 

New Catalog & Price List – 6/1/2021 Effective Date – Amba Products

Dear Amba Customer, 

We are excited to launch our latest product catalog and price list with several new updates and improvements. In this update you will find new finish offerings including the expansion of our Matte Black and the launch of our Polished Gold finish; and the addition of accessories and components. We are also rolling out a new price list which will be effective on June 1st, 2021 (6/1/2021). 

Please find links below to the new catalog and our new price list in .pdf & .xlsx formats. Your local rep will receive the new catalogs around the first week of May to begin updating your binders. Please reach out to them so you can schedule a time for them to update you. If you aren’t sure who your local rep is, please respond back with your company and branch address and we’ll happily follow up with those details. 

REMINDER : New 2021 Julien Price List in effect May 1st

Dear Client,

This is a reminder that the new Home Refinements prices will become effective May 1st.  Printed copies of the price list have been sent to you and should be delivered at this time or arrive shortly.
 
We thank you for your ongoing support and trust through these tumultuous times. We look forward to continue building a healthy and strong partnership by providing exclusive quality products and services.
 
Price Increase – Effective May 1st 2021
·        3% increase UrbanEdge Collection
·        3% increase J7® Collection
·        Increase in shipping costs and FFA
 
New SmartStation Sets and AccessoriesIncluded in the 2021 Home Refinements price list are the new SmartStation sets and accessories that have been officially launched on April 15. Discover a whole new range of functionalities that will certainly answer your customer’s needs.All Home Refinements by Julien sinks and accessories are expertly manufactured and assembled by our dedicated workers in our factory based in beautiful Quebec City.

Robern Lead Time Report – November 10, 2020

Robern Customer Delight Team

  • We are currently between a 24-72 business hour response time for the email boxes.

Profiles – Medicine Cabinet – Matte Black – 16” W

  • We shipped all open orders for the 16” W Medicine Cabinet in the Matte Black finish.

Profiles – Lighting

  • We shipped all open orders for Profiles Lighting.

Vesper Edgeline 30” H

  • We shipped all open orders for the Vesper Edgeline 30” H.

Profiles – Medicine Cabinet – Polished Nickel – 30” H

  • We are currently unable to produce the 30” H Profiles Medicine Cabinets in Polished Nickel. We expect to be able to ship all open orders by early December.

Main Line Medicine Cabinets and Mirrors – Brushed Nickel, Satin Nickel, Brushed Bronze, Brushed Black

  • We are currently unable to produce the Main Line Medicine Cabinets and Mirrors in the Brushed Nickel, Satin Nickel, Brushed Bronze, and Brushed Black finishes. We expect to be able to ship all open orders by December 4.

Vitality Mirror – YM4836RGFPD3P

  • We are currently unable to ship the YM4836RGFPD3P. We expect to be able to ship all open orders by November 24.

AiO Medicine Cabinets

  • Due to increased demand, we are experiencing approximately a 1 week delay on AiO Medicine Cabinets. We expect to be back to our normal 2 week lead time by mid-December.

Vitality Medicine Cabinets

  • Due to increased demand, we are experiencing approximately a 1 week delay on Vitality Medicine Cabinets. We expect to be back to our normal 2 week lead time by mid-December.

Freestanding Cartesian, Profiles, and Legs

  • We are currently unable to produce the 30” legs. We expect to be able to ship all open orders by the end of November.

Classic and Inspire finishes, Profiles vanities, and stone tops are back to a 4 week lead time.

All other cabinets, wall mirrors, vanities in the Essentials finishes, lighting, and glass tops are back to a 2 week lead time. To review standard lead times, visit here.

NEW- SATIN BRASS AND SATIN BLACK URBAN STEEL MIRRORS

 NEW!  URBAN STEEL MIRRORS NOW AVAILABLE IN SATIN BRASS AND MATTE BLACK

–          Now in stock and ready to ship from our New Jersey warehouse.

–          Special introductory display discount – 80% off list – available through November 26.

New Mountain Air Switches and BWO

Hello,
Please see a couple of new designs for our air switches as well as new models for BWO that are not in the current book. We will send updated excel lists over ASAP. 

NEW Deluxe Air Switch DesignsWe have added 2 new designs to our popular Deluxe Air Switch Collection, Introducing a knurled version of the MT957R and a traditionally styled raised air switch button. All made of solid brass construction and available in all finishes. IN STOCK

as1.png
as2.png

New BDXE BWOPlease find attached our updated price sheet for the BDXE BWO. We have added a separate model for tubs that require a longer horizontal drain pipe, such as the Victoria and Albert tubs.

Design is in the details: NEW Sonia Bathroom Accessories

Jason International – Ordering Deadlines for November

Orderling Deadlines for November
With the end of the year closing in as well as numerous updates to our production and ordering software systems, the following ordering deadlines and holiday closings should be noted when ordering your Jason products.
Beginning this week, we are also implementing a 4-week lead time for the duration to allow for changes to the new systems, but we will strive for much sooner!
November 25th, 2020 (by noon): Deadline to order baths equipped with hydrotherapy options to be shipped before December 28th.
November 26-27, 2020: Offices closed for Thanksgiving and system switch.

SUBZERO/WOLF DISCONTINUATIONS AND NEXT GENERATION MODELS