“The Time Is Always Right To Do The Right Thing.” – Dr. MLK Jr.

Updates from Marvin Montgomery
Sales Tip #536 From The Sales Doctor
“The Time Is Always Right To Do The Right Thing” – Dr. MLK Jr.

Last week, you probably saw that I reintroduced the Early Bird Registration discount for my Mastering the Sales Essentials series that begins on Tuesday, May 4th at 12 Noon.

The question was asked, “What about the participants that already paid the higher amount?” I immediately replied that they would receive a refund for the difference because it’s the right thing to do.

It’s never the wrong time to do the right thing. I hope you feel the same way, too.

Fairmont Update – Update on 2021 New Intros

A couple of items I wanted to share with you.

1) Smithfield II Pricing – please find attached both an updated 2021 Excel Pricing file that includes the 1544 Smithfield II pricing and a PDF Smithfield II pricing sheet.

2)  Please see below for ETA’s of when Fairmont expects  to see the first shipments of the new introductions: (2021 New Introductions brochure should be available next month.) 

            1553 Brookings – White – 5/7

            1544 Smithfield II – 8/1

            1548 Live Edge – 8/11

            1711 Design Studio – 9/26

            1712 Design Studio – 10/6

Based on this update Fairmont has decided to delay the  “Launch Display Promotion” until they get closer to having these new products available. Fairmont feels that delaying the promotion  is the right thing to do as they continue to catch up with their current inventory situation. 

3)  Also, in the attachment is the  Fairmont Sale sheet that has deep discounted net prices on the discontinued items that Fairmont still has inventory.

Updated Lead Times for The Furniture Guild

Just a quick update on TFG lead times, – we are currently looking at 8 – 10 weeks for standard orders and  8 – 10 weeks for custom orders after the 1-2 week lead time for CAD approvals. TFG is working on decreasing these lead times in the near future but we also want to give you and your clients realistic expectations. We will keep you updated on any changesThanks so much for your continued support!

Fairmont Promotions-: Ceramic Top Promo and Undermount Sink Promo

Please find in the attachments two Fairmont promotions.

Ceramic Top Promo running now thru June 30, 2021 and the Undermount Sink Promo running now thru December 31, 2021.

Please see the attachments for all the details.

Mountain: New Francis Anthony Faucets with Industrial Handles & Knurled Air Switch Spec Sheets

Mountain Plumbing just introduced our brand new Francis Anthony faucets with different spout styles and Industrial Handles. I attached a list with pricing of all new models along with a couple of close ups of the industrial handles. These faucets are available to order now, display pricing is at .225.
We are also now offering the new knurled airswitch and a new traditional airswitch. Both spec sheets as well as pricing are attached. 

Basco Update: Continued Supply Chain Challenges

Continued Supply Chain Challenges 
We regret to inform you that we are currently experiencing extended lead times for thefollowing models:Classic semi-frameless bypass sliding doors (3400/3500)- all finishes except Oil Rubbed Bronze
Deluxe framed bypass sliding doors (6150/7150) – all finishes except Oil Rubbed Bronze 
All Rolaire rolling door with stationary panel configurations in Brushed Stainless (still available in Polished Chrome)
3400/3500 & 6150/7150 should return to regular lead times in mid-May and Brushed Stainless Rolaires are expected to return to normal lead times at the end of June. While we know this can be frustrating, we still have many doors that are shipping normally as great alternatives for your customers. View this list of models with regular lead times for more information. If you have any questions, please contact our Customer Service department. 
Download Letter

Robern Lead Time Report – April 19, 2021

Robern Customer Delight Team

  • We are currently between a 24-48 business hour response time for all email boxes.

Vitality – 24” W x 40” H Mirror – Perimeter Lit, Title 24

  • We shipped out all open orders and are back to our normal lead time on the YM2440RPFPD3K. 

Vitality – 48” W x 36” H (Rotate) Mirror – Perimeter Lit

  • We shipped out all open orders and are back to our normal lead time on the YM4836RPFPD3P. 

Sculpt – 25” W x 41” H (Slim) and 27” W x 43” H (Chamfer) Mirrors – Title 24

  • We shipped out all open orders for the above sizes in all finishes (Chrome, Polished Nickel, Matte Gold, Matte Black) and are back to our normal lead time.

PL Series White & Black Medicine Cabinets – Non-Electric & Electric

  • We will be accepting orders for the PL Series White and Black Medicine Cabinets through April 30th. As they are discontinued, they will be available in limited quantities (while supplies last).

Profiles Medicine Cabinets – 48” H – Matte Gold

  • We are currently unable to produce the Profiles Medicine Cabinets – 48” H – Matte Gold. We expect to begin shipping again by early June. We expect to be back to our normal 2 week lead time by the middle of June.

Profiles Medicine Cabinets – 16” W – Matte Black

  • We are currently unable to produce the Profiles Medicine Cabinets – 16” W – Matte Black. We expect to begin shipping again by the middle of April. We expect to be back to our normal 2 week lead time by the end of April.

Profiles Medicine Cabinets – 20” W – Chrome

  • We are currently unable to produce the Profiles Medicine Cabinets – 20” W – Chrome. We expect to begin shipping again by the middle of April. We expect to be back to our normal 2 week lead time by the end of April.

Profiles Medicine Cabinets – 24” W – Matte Gold

  • We are currently unable to produce the Profiles Medicine Cabinets – 24” W – Matte Gold. We expect to begin shipping again by the middle of April. We expect to be back to our normal 2 week lead time by the end of April.

Vitality – 30” W x 40” H Mirror – Perimeter Lit

  • We are currently unable to ship the YM3040RPFPD3. We expect to begin to ship by the end of May. We expect to be back to our normal 2 week lead time by early June.

Sculpt – 31” W x 41” H (Slim) and 33” W x 43” H (Chamfer) Mirrors

  • We are currently unable to ship the above sizes in all finishes (Chrome, Polished Nickel, Matte Gold, Matte Black). We expect to begin to ship by the end of May. We expect to be back to our normal 2 week lead time by early June.

M Series Push Kit

  • We are currently unable to produce the M Series Push Kit. We expect to begin shipping again by the middle of May. We expect to be back to our normal 2 week lead time by the 3rd week in May.

Profiles Mirror Ganging Kit – 24” W x 30” H

  • We are currently unable to produce the Profiles Mirror Ganging Kit – 24” W x 30” H. We expect to begin shipping again by the end of April. We expect to be back to our normal 2 week lead time by the 1st week in May.

Classic and Inspire finishes, Profiles vanities, and Engineered Stone Tops are at a 4 week lead time.

All other cabinets, wall mirrors, vanities in the Essentials finishes, lighting, and glass tops are at a 2 week lead time. To review standard lead times, visit here.

Furniture Guild Lead Time Change

Beginning April 19, 2021, lead times for all standard Furniture Guild products will be 8-10 weeks. Custom orders will maintain the 1-2 week lead time for CAD approvals then follow with an 8-10 week production time. While we hope to decrease the lead time in the near future, we also want to provide realistic ship dates for your customers. We are so grateful for your support and as always, please feel free to call with any questions you may have.

Sonia Inventory Availability

LG Updated Promo Calendar

Please see the attached updated LG promo calendar.  The Earth Day promo continues on through April 28. 

LG’s next major promo – Memorial Day starts May 20.  Keep an eye on updates coming though over this next month, but as it sets now, all LG laundry will be back on promo with buy in opportunities for Memorial Day.