Liebherr & Uline Promos 2023
Fulgor Milano Rebates Promotions 2023
Stone Forest 7/2022
Robern Lead Time Report – February 2, 2023
- We are currently at a 24-business hour response time!
Please see attached for an update on Craft Series inventory.
| Category | Product | Model # | Ship Date | Back to Normal Lead Time | |||||
| Medicine Cabinets | PL Portray, Main Line – 20” W x 30” H in the Flat, Polished mirror; Murray Hill – all sizes | End of February | Second week in March | ||||||
| Medicine Cabinets | PL Portray, Main Line – 24” W x 30” H in the Flat, Polished mirror | End of February | Second week in March | ||||||
| Medicine Cabinets | PL Portray – 12” W x 30” H in the Flat, Polished mirror | End of February | Second week in March | ||||||
| Medicine Cabinets | Craft Series | Most cabinets shipping now; Additional quantities shipping Middle of February | Middle of February | ||||||
| Medicine Cabinets | R Series – 24” W x 36” H in the Flat, Beveled mirror | Second week in February | Second week in February | ||||||
| Medicine Cabinets | R Series – 20” W x 36” H in the Flat, Beveled mirror | Middle of February | Middle of February | ||||||
| Mirrors | Vitality | Limited quantities available now; Potential 30-60 day delay | |||||||
| Mirrors | Sculpt | Limited quantities available now; Potential 30-60 day delay | |||||||
| Mirrors | Craft Series – Round Corner Metal in Stainless Steel | CM2034RC84 | Early March | Early March | |||||
| Mirrors | Profiles – 24” W – Polished Nickel | Early March | Early March | ||||||
| Mirrors | Craft Series – Round Corner Metal in Aged Brass – 20” W x 34” H, 24” W x 44” H; Thin Frame Metal in Aged Brass or Brushed Pewter – 20” W x 30” H, 24” W x 40” H | CM2034RC87, CM2444RC87, CM2030TF87, CM2440TF87, CM2030TF69, CM2440TF69 | Up to a 20-week delay. Similar versions available now with a 2-week lead time. | TBD | |||||
| Accessory | Glass Sink – 37” W x 19” D – 8” Widespread in White | TC37UCN21-8 | Second week in February | Second week in February |
Classic and Inspire finishes, Profiles vanities, and Engineered Stone Tops are at a 4-week lead time.
All other cabinets, wall mirrors, vanities in the Essentials finishes, lighting, and glass tops are at a 2-week lead time. To review standard lead times, visit here.
BSH Recovery Mode
Column and French Door Built In Situation:
The plan is that we recover all backorders for Built in excluding Wine Columns (backorders will continue for now) by end of February. Meaning March 1st we will be out of backorder and stock positive.
Freestanding Refrigeration:
The plan shows we will most likely fill all backorders by February and start to see stock March 1st
ADA 18 Inch Dish:
Available and we have stock currently.
800 , 500 series Dish:
We will likely go into the launch of new Model Lines with a backorder situation.
100 series Dish:
We will likely be out of backorder by February and have stock moving forward.
Bosch Slide In Gas and Duel Fuel Electric and Induction Ranges:
We have stock of these models.
Bosch Thermador Ovens and combos:
We are projecting to be out of backorders By April 1st.
Bosch Thermador Gas Cooktops:
Bosch has stock
Thermador projecting end of February out of backorder.
Thermador Pro Ranges Harmony and Grand:
PRG366WH has stock in most warehouses right now.
All Harmony and Grand Ranges are projected to be out of backorder by July.
In summary, Bosch product (besides 800 500 series dish) seems to have had a quick recovery here moving forward for Q1. We do have the German model dishwashers in stock and more on the way to order in place of those series.
Thermador – We should now be able to concentrate on Filling the pipeline with orders and be pretty confident that consumers will not have to wait an astronomical amount of time for them to come in. Looks like most product categories recover by end of March and Ranges all sizes by end of July. Again some models within categories will recover faster than others but this info should give us some peace of mind to get back on track writing orders for upcoming kitchens for our customers.
Things not spec- Wine Columns ,Ventilation .
TOTO USA Lead Time Guide Updated
Those Who Keep Learning, Will Keep Rising

Sales Tip #627 From The Sales Doctor
“Those Who Keep Learning, Will Keep Rising.”
– Charlie Munger
Charlie Munger is a self-made billionaire and the Vice Chairman of Berkshire Hathaway at 99 years old.
“Most people stop learning at 18,” Munger states.
“But knowledge is an asset that compounds over time – the more you know, the better you think. You’ll make better choices that will yield great consequences.”
Take it from Charlie: Make time in 2023 for self-improvement!
Baldwin Hardware Product Delay’s
Effective immediately –
Baldwin Cremone Bolts, surface bolts, Dutch Door Quadrants and the MP009 (Multipoint Bristol Trim) all sizes, functions and finishes will have extended lead-times direct from Baldwin. I realize these aren’t high volume items for all, but wanted to let you know so you were surprised by lead-time on acknowledgements.
In meantime, if you are in immediate need of some of these items; a wholesaler on east coast called Direct Security Supply stocks cremone bolts, surface bolts and quadrants in several finishes. Their number is (800) 252-5757.
We are working with our manufacturing teams and suppliers to get these items back to normal made to order 4-5 week lead-time. I will send out another message once we have these items restored.
Below are some images of the items.
I apologize for inconvenience, but wanted to be proactive until I got a better idea of when internal production issues are under control.
Let me know if you have any questions.