Robern Lead Time 8/25
• We are currently at a 24-business hour response time!
Please see attached for an update on Craft Series inventory.
| Category | Product | Model # | Ship Date | Back to Normal Lead Time |
| Medicine Cabinets | Profiles – 48” H Polished Nickel | TBD | TBD | |
| Medicine Cabinets | M Series 20” W x 30” H and 24” W x 30” H,Arch + Bevel | 1st week of September | 1st week of September | |
| Medicine Cabinets, Vanities, Accessories | M Series 70” H, Cartesian – White (finish -21) | Mid-September | End of September | |
| Vanities | Profiles – White (finish -21) | Mid-September | End of September | |
| Vanities | Cartesian – Reeded White (finish -60), 30” W x 15” H | 2nd week of September | 2nd week of September | |
| Vanity Accessory | Glass Hair Organizer | VAHAIRORG | TBD | TBD |
| Vanity Tops | Bodo/Skaarsgard Integrated Top – 36” W | TA36MCO102-8CS8 | Shipping units the 1st week in September – orders submitted through 6/14. Additional units tentatively shipping 1st week in October. | TBD |
| Vanity Tops | Bodo/Skaarsgard Integrated Top – 60” W | TA60MCO102-8CS8 | Shipping units the 1st week in September – orders submitted through 8/17. Additional units tentatively shipping 1st week in October. | TBD |
| Vanity Tops | Glass Sink – 31” W x 19” D, 8” Widespread | TC31UCN21-8 | TBD | TBD |
| Accessory | Mag Mirror – Wall Mount, Lit – Chrome | 5M0008WLUT76 | Second week of September | Second week of September |
Classic and Inspire finishes, Profiles vanities, and Engineered Stone Tops are at a 4-week lead time.
All other cabinets, wall mirrors, vanities in the Essentials finishes, lighting, and glass tops are at a 2-week lead time. To review standard lead times, visit here.
Swan Price Guide, Revised
| REVISED Swan Price Guide Information REVISED Swan Price Guide In an effort to improve the Swan experience, we have made corrections to the PDF price guide. It can be downloaded below along with the Swan EPF. We encourage you to always look to the website and EPF as the most valid source of product data. We thank you for your patience as we work together to Building Better Surfaces. Click on the button above for:REVISED Price GuideREVISED Electronic Price File (EPF)Swan websiteIf you have any questions, please reach out to any of your local BWA South Team members. |
LG Updated Promo Calendar
BSH Lead Time Updates 8/22
Whatever You Do, Do It Well!

Sales Tip #606 From The Sales Doctor
Whatever You Do, Do It Well!
“Whatever you do, do it well. Do it so well, when people see you do it, they will want to come back and see you do it again, and they will want to bring others and show them how well you do what you do.” – Walt Disney
Well said, Walt!
TOTO USA Lead Time Guide Update (LB#22-16)
Robern Lead Time Report – August 18, 2022
• We are currently at a 24-business hour response time!
Please see attached for an update on Craft Series inventory.
| Category | Product | Model # | Ship Date | Back to Normal Lead Time |
| Medicine Cabinets | Profiles – 48” H Polished Nickel | TBD | TBD | |
| Medicine Cabinets | M Series 20” W x 30” H and 24” W x 30” H,Arch + Bevel | 1st week of September | 1st week of September | |
| Medicine Cabinets, Vanities, Accessories | M Series 70” H, Cartesian – White (finish -21) | Mid-September | End of September | |
| Vanities | Profiles – White (finish -21) | Mid-September | End of September | |
| Vanities | Cartesian – Reeded White (finish -60), 30” W x 15” H | 2nd week of September | 2nd week of September | |
| Vanity Accessory | Glass Hair Organizer | VAHAIRORG | TBD | TBD |
| Vanity Tops | Bodo/Skaarsgard Integrated Top – 36” W | TA36MCO102-8CS8 | Shipping units the 1st week in September – orders submitted through 6/14. Additional units tentatively shipping 1st week in October. | TBD |
| Vanity Tops | Bodo/Skaarsgard Integrated Top – 60” W | TA60MCO102-8CS8 | Shipping units the 1st week in September – orders submitted through 8/17. Additional units tentatively shipping 1st week in October. | TBD |
| Vanity Tops | Glass Sink – 31” W x 19” D, 8” Widespread | TC31UCN21-8 | TBD | TBD |
| Accessory | Mag Mirror – Wall Mount, Lit – Chrome | 5M0008WLUT76 | Second week of September | Second week of September |
Classic and Inspire finishes, Profiles vanities, and Engineered Stone Tops are at a 4-week lead time.
All other cabinets, wall mirrors, vanities in the Essentials finishes, lighting, and glass tops are at a 2-week lead time. To review standard lead times, visit here.
Miele Update: Inventory Report 8.16.2022
Attached you will find our current/inbound inventory report, updated daily on our Miele Dealer Portal.
A FEW THINGS TO NOTE:
- Inventory levels shown are as of this morning’s start of business.
- We are not taking new orders on dish yet—I will update everyone as the situation develops.
- Unless the unit is physically in stock, we cannot guarantee ETA’s provided by the dealer portal due to the continuing global supply chain disruption and congestion at our inbound ports .
- Availability will change and fluctuate as a result of orders and stock movements throughout the day.
- The inventory available is determined by the warehouse that serves your location:
- OH & KY pull from our NJ warehouse.
- IN accounts pull from our IL warehouse.
- Orders can only be fulfilled out of your designated warehouse location.
- The report that I am attaching has been slightly edited to show the most relevant information.
- Incoming units shown are available as of this morning—more accurate ETA’s will be shown when reviewing an order before submitting.
- If there is no date provided, we are 11+ weeks out due to demand exceeding capacity and U.S. ports currently behind by 4-6 weeks.